Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | DLY |
Model Number : | Stud And Track Lines |
Certification : | CE |
Price : | Negotiable |
Payment Terms : | T/T |
Supply Ability : | 30sets/month |
Delivery Time : | 40 days |
Light Gauge Stud And Track Lines Keel Roll Forming Machine With Non-Stop Cutting
1. Specification of Keel Roll Forming Machine
Machinable Material : | A) Galvanized Coil | Thickness(MM):0.9, 1.0, 1.2 |
B) S350 | ||
C) S450 | ||
Yield strength : | 350 - 450 Mpa | |
Tensil stress : | 350 Mpa-550 Mpa | |
Nominal forming speed(M/MIN): | 0-20 | * Or according to your requirement (Optional) |
Forming station : | 34 stands | |
Decoiler : | Manual decoiler | * Hydraulic decoiler (Optional) |
Punching system | No | * Hydraulic punching or Punching press (Optional) |
Main machine motor brand : | Sino-Germany Brand | * Siemens (Optional) |
Driving system : | Chain drive | * Gearbox drive (Optional) |
Machine structure: | Wall panel station | * Forged Iron station or torri stand structure (Optional) |
Rollers’ material : | GCr15 | |
Cutting system : | Post-cutting | * Pre-cutting (optional) |
Frequency changer brand : | Yaskawa | * Siemens (optional) |
PLC brand : | Panasonic | * Siemens (optional) |
Power supply : | 380V 50Hz | * Or according to your requirment |
Machine color : | Industrial blue | * Or according to your requirment |
2. description of Keel Roll Forming Machine
A drywall stud and track roll forming machine usually consists of manual decoiler, a feeding guide unit, a punching tool, a roll forming unit, a cutting unit, a transmission unit, a hydraulic unit, a control unit, and run-out tables. Under PLC control system, this drywall stud and track roll forming machine fully automatically produces 4-6 metal c studs or u tracks out of galvanized steel.
3. FAQ of of Keel Roll Forming Machine
A. Foreign commissioning
We will arrange our professional engineers to help you install and
debug the machine well. Buyer should pay$100 for each engineer
every day and responsible for transportation (including round-trip
ticket), insurance, and suitable accommodation.
B.Warranty period
The warranty will be maintenance, maintain in the guarantee period
of 18months starting from delivery. Because of the quality of
equipment during guarantee period, we will provide the parts to
charge freely, which is in the conditions of correct operation.
C. Training
During installation and adjustment of the equipment, our engineers
are able to provide the training that buyer’s personnel request to
operate and maintain the equipment.Including foundation
construction, electrical works, hydraulic oil, safe operation and
non-standard safety items, testing material and etc.
D. Services
Lifetime services to every customer.
Welcome to contact and visit us.Waiting for your cooperation
sincerely.
4. details photos of Keel Roll Forming Machine
![]() |